Car parts (車道 部, carriage area) driveway and Chung-Ang University, Traffic island, Throughout the major part of the road consisting of all or part of the shoulder called the car parts.
Loading gauge (車輛 限界, car gauge, car limit, dish washer cleaner rolling stock vehicle gauge) as a regulation put to shame in order to determine the production vehicle during a certain standard, limits any part of the vehicle is not allowed to be in conflict with the limitations. The railway when the vehicle is positioned correctly on the straight track, vehicle parts are speaking the limits of the section should not go out than that. To prevent accidents due to contact of a vehicle shake, that establish a slight gap for a couple of small building limits. According to the vehicle hangyeryeong based on dorobeop, 20ton weight or more, more than 2.5m width, length 12m or more, if the car is not more than 3.8m in height with the permission dish washer cleaner of road manager, you can not pass the aisle on dorobeop. In this case, also special restrictions other vehicles in the car, especially when you get a permit.
Sodium hypochlorite (次 亞 鹽 素 酸 -, sodium hypochlorites) as one of the hypochlorite, chlorine gas by absorption in a sodium hydroxide solution obtained luggage. It is commercially available as the appearance of the aqueous solution of 4-12% available chlorine light yellow, transparent dish washer cleaner liquid strongly alkaline, readily decomposed, also releasing oxygen. dish washer cleaner The cursor oxidative bleach, that are used as disinfectants, such as the oxidizing agent.
Chaeumjae (遮 音 材, sound insulation material) sound insulation material. dish washer cleaner Sound insulating material (遮 音 材料, sound insulating material) to reflect the incident sound is difficult to permeate the material on the opposite side. Internal viscosity is not large, ventilated, and the transmission loss value is greater sound insulation effect is a great material for concrete, brick, metal and other various bodeuryu and found this.
Drill (鑿岩 機, drill) generic name of the machine to punch the rocks.
Responsibility surveyors (責任 測量 士, quantity surveyor) is responsible for surveyors selected as technicians dish washer cleaner responsible dish washer cleaner for the entire process less of surveying, dish washer cleaner construction, giseonggo, completion, completed after aging research various volume calculations and checks and manages the whole process responsible for evaluation . QS surveyor referred to contribute to the elegant construction workers on construction progress with the required precision. dish washer cleaner
Heaven settlement (天 沈下 端, crown settlement) Stability of tunnel surrounding rock bolts and wonjiban means the deflection of the tunnel ceiling, jibogong effects dish washer cleaner such as pumping and paste identify dish washer cleaner concrete and effective convergence yiyongdoem to identify and cross-sectional (有效 高). Tunnel to Heaven at appropriate intervals to install the station and punched ago, after perforation, pumping concrete paste and then separated by rock bolts, and then measure and should carry out such measures until the settlement is converging.
Transition temperature (遷移 溫度, transition temperature) material destruction temperature is rapidly changing to a certain temperature form a boundary. In general, dish washer cleaner the temperature range varies from ductile dish washer cleaner to brittle fracture.
Circumzenithal arc (淺井 戶, shallow well) wells pumping groundwater or Subterranean river in the upper than the first impermeable layer from the surface. dish washer cleaner If separated by ability to pull up the pump, but the atmospheric pressure is order 10m, considering the resistance loss of lift and pull out when one speaks of the well within this range as the depth of the absorbing surface within about 7m. Hora feels that this should be the opposite.
Reinforcement ratio (鐵 筋 比, steel ratio) and the ratio of the reinforced concrete cross-sectional area in the cross section of reinforced concrete members.
Laying Railway (鐵道 敷設, construction / building of railway) to expansion or new track.
Peak load (尖頭 負荷, peak load) load of the greatest value in the load variation during the day. The peak load is generated in the early evening, in the daytime, and that by supplying the load variation by controlling the hydroelectric power.
Systematic planning process (体系 计划 过程, system planning process) plan itself a goal and scope in accordance with the components of systematically organized according to the plan of nature in part or in whole, by pinpointing the part between the correlation (inter-relation) or implicit rational planning process or approach to finding alternatives that issues such as planning, as well as objectivity and figure out.
The residence time (滯留 時間, detention / retention time residence dish washer cleaner time) divided by the volume of sewage treatment equipment, such as a processing speed of the fluid. As being a measure of the processing capabilities of the processing equipment when the residence time less processing power also means high. The water flowing dish washer cleaner from the open sea, etc. Obstructive only within the medial represents the time to stay in until the release back to the open sea only within dish washer cleaner the longer dish washer cleaner the residence time of water is likely to be exacerbated High.
Volume change (體積 變化, volume change) to the external force acting on an object, the original volume of the given object deformation caused by the change.
The initial shrinkage (初期 乾燥 收縮, initial dry shrinkage) car after a certain dish washer cleaner length of specimen length and the first length of the drying of the specimen was put into a mold curing compaction under certain conditions. As represented as a percentage dish washer cleaner of the length of the wet state.
The initial voltage (初期 轉 壓, breakdown rolling) dish washer cleaner Compaction Method for performing a commitment to increase the heating effect dish washer cleaner after laying the asphalt mixture, dish washer cleaner the mixture causing the displacement or hair cracks (hair crack) carried out at high temperatures can not occur at this limit box. Commonly referred to as "primary commitment" and low-De roller used twice (one round trip) be conducted.
The initial pressure (初期 地 壓, primary state of ground pressure), also known as the primary pressure and joint, dish washer cleaner such as when digging a tunnel or underground power station inside the ground, gareukim the pressure that was applied to the soil prior to doing. The initial pressure of the cause of the stress caused by soil weight, stress due to crustal movements, the impact of the terrain, the rock physical, delimited by chemical changes such as stress.
Ultrasonic flaw detector (超音波 探傷 器, ultrasonic flow detector, ultrasonic rail tester) equipment to detect damage to the rail by ultrasound.
The total energy (總 -, total energy) position an object with the energy, pressure energy, kinetic energy, such as the sum of all energy.
The maximum possible rainfall (最大 可能 降雨量, maximum probable rainfall) given at the watershed or drainage area, which may occur under the climatic conditions that exist in the physical maximum rainfall. Also known as Maximum rainfall.
Maximum wave height (最大 波 高, maximum wave height), coming up to par.
The minimum potential energy theorem (最小 - 定理, principle of minimum potential energy) in a modified form that satisfies the equilibrium conditions of all the variants that satisfy the geometric boundary conditions at the structural system has the minimum potential energy is clean.
Choi hwaksu (最 確 數, most probable number) refers to suitable levels for units obtained by the quantitative tests of coliform bacteria. The number dish washer cleaner of samples dish washer cleaner 0.01, 0.1, 1.0, 10.0 mL and subsequently diluted 10 times each, doing each 5 each coliforms (群) test for four or more steps that. Table or statistically that the sample can be determined by the value calculated MPN per 100 mL.
Propulsion Method (推進 工 法, jacking dish washer cleaner method) promoting the structural dish washer cleaner body of the pre-cast products in the ground after removing the sediment of the internal Refers to the process of digging a tunnel repeatedly pushing the construction work again. This method is often difficult to construction of a general excavation method applied to the case or difficult to use, such as the laying of the pipeline is being used in a large cross-section across the road below.
Axial load (軸 方向 荷重, axial load) in the axial direction of the load acting member.
Departure station (出發 驛, starting station) to the train station to station in the City of track time.
Shockwave (衝擊波, impulsive wave , shock wave) will be extremely rapid action in a short time, and power in the form of a wave propagation stress. In the vicinity of the flow of the mixed flow point bending dish washer cleaner when it comes to the bend will decrease the flow rate, the water should rise. The water delivery rate of rise is not able to be passed to the upstream flow rate less than the OA discontinuity formed as shown in the picture. It called shock waves. discontinuities occurring during the traffic flow of traffic density.
Fetch distance (吹送 距離, fetch, fetch length) sea level when estimating the development of the wave above 5~7.5 by wind blowing over the average wind speed measured by the average length direction of the wind and sea.
Bypass (側 管, bypass pipe) to send the water pipe is installed directly dish washer cleaner on these facilities mainly to bypass some of the facilities for repair or cleaning in water purification plants. For example, to install only one small sedimentation in water treatment dish washer cleaner plant and raw water turbidity is 10 to spend on time even within one settler bypass without going directly to the filter paper in some cases repair or clean a settler in the meantime.
Side-fashioned excavation method (側 溝 式 開鑿 工 法, trench method) several cases, dish washer cleaner depending on the reason why you can not digging the whole cross-section at a time preceding a bilateral wall portion and a central pillar of the structure excavation and building the parts and oysters the middle of the next
No comments:
Post a Comment